Client: Kelbuild Construction
Project Activity: Design and Construct Truss-Out Scaffold Structure to Facilitate Re-Roofing Project
Challenges:
Design and construct a compact Truss-Out scaffold structure to be fully supported from a stone wall structure 1m below eaves level.
Operatives working at a height over fast flowing River Liffey.
Structural complexities within the activity location.
To design a structural system that would eliminate fixed-end moments at building window ope.
To avoid the traditional method for constructing a truss out and develop an innovative safer system of work that would enable scaffold operatives to work within a safe zone during installation of scaffold structure.
Engineered Solution: